CHICAGO – “Secret Scoop,” who first informed [5] me of the upcoming Brach’s Candy building implosion for “The Dark Knight,” at 1:11 p.m. on Friday submitted updated information about this historic scene.
It is scheduled to happen between 10:30 a.m. and noon on Aug. 29.
This will be two buildings. The larger building is to be filled with flammable liquids and the second smaller, four-story building will be imploded.
This is the last big stunt for the film to be shot.
By the way, [Friday night’s] filming features five SWAT guys being thrown out of a window of a high-rise to hang while Batman goes about his business.
He doesn’t want to kill them. He just wants get them out of the way.
1:27 p.m. update: In a follow-up e-mail, I asked my source about the certainty of this new information. “Secret Scoop” said:
I just got off the phone with my contact before I e-mailed you. I even asked if that could be a false date just to throw off fans. [It’s real.]
4:10 p.m. update: Several people have written in asking me the address for this site. It is 401 N. Cicero Ave. in Chicago.
[6] | By ADAM FENDELMAN [7] |
Links:
[1] http://www.hollywoodchicago.com/users/hollywoodchicagocom
[2] http://www.hollywoodchicago.com/news/adam-fendelman
[3] http://www.hollywoodchicago.com/news/gotham-general-hospital
[4] http://www.hollywoodchicago.com/labels/dark_knight.html
[5] http://www.hollywoodchicago.com/2007/08/scooper-says-four-story-building-will.html
[6] mailto:adam@hollywoodchicago.com
[7] http://www.hollywoodchicago.com/about#ADAM